• One step process instead of cutting, excavating, hauling, and dumping.
  • This program recycles asphalt that would normally be dumped into expensive landfills.
  • Recycled asphalt is re-usable as approved back fill.
  • Trucking of broken asphalt is eliminated. The asphalt can be stock piled on site for back fill later.
  • No pipe laying delays. After we grind the trench, the grindings can be left in the trench as a temporary road patch and traffic can immediately drive over the trench.
  • Our grinders are equipped with side bits that produce a feathered rough edge along the trench sides rather than a straight cold cut (from saw cutting). This allows for a superior base and final install of hot mix asphalt when the job is completed.
  • Comparable or less costly than saw cutting... or much less costly after you factor in stripping, hauling, and dumping of asphalt chunks.
  • Reduce your restoration costs and excavation costs with a narrow trench.
  • Our profiling machines also allow us to prepare existing asphalt for overlays and patching.